Laserfiche WebLink
11. Maintenance Building — extend two walls in M103 and M109 by 4' each. <br />Add light fixtures, glass, masonry, metal roof panels, carpentry, ceiling, <br />paint. <br />ADD $4,028.00 <br />Acceptable. <br />12. Move a/c condensing units on Office to sidewalls. Add concrete pads <br />and coolant lines. <br />ADD $1,008.00 <br />Acceptable with Comments: <br />• Pettit & Pettit — Extend electrical circuits and refrigerant piping as <br />needed. <br />13. Maintenance Building — move air compressor to the outside, extend air <br />lines, add 4' x 6' chain link enclosure with metal panel roof. <br />ADD $6,296.00 <br />Acceptable with Comments: <br />• Pettit & Pettit — Extend electrical circuits as needed. <br />14. Vehicle Storage — add three overhead doors, delete one personnel <br />door, add electrical power, add six painted pipe bollards. <br />ADD $26,757.00 <br />Acceptable. <br />15. OFFICE — Delete safety room, delete masonry and above grade <br />concrete, change to normal entry door. <br />DEDUCT $17,680.00 <br />Acceptable. <br />4of5 <br />