My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022 Agreement with M&A Jones for construction
CITY-OF-BATESVILLE
>
City Public Works Facility Bulding Project
>
Public Works Facility Documents
>
2022 Agreement with M&A Jones for construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2022 3:15:30 PM
Creation date
10/10/2022 9:42:27 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
16. Vehicle Storage — enclose wash bay <br />- Add sidewalls to metal building, add two overhead doors, add four <br />painted pipe bollards, add electric power, add 4" fiberglass insulation <br />ADD $25,157.00 <br />Acceptable. <br />17. Maintenance Building <br />- Go to Ashford formula concrete hardener <br />ADD $3,784.00 <br />Acceptable <br />18. Maintenance Building and Vehicle Storage <br />- Delete galvanized snow bar <br />DEDUCT $23,236.00 <br />Owner's Call. <br />19. Go to 1000 gallon sand filter in lieu of 2000 gallon. <br />DEDUCT $2,800.00 <br />Acceptable. <br />20. OFFICE — delete two 5A aluminum glass openings and wooden doors in <br />0115 and 0116. Add metal studs and painted gypsum board. <br />DEDUCT $4,416.00 <br />Acceptable. <br />September 30, 2022 <br />5of5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.