Laserfiche WebLink
16. Vehicle Storage — enclose wash bay <br />- Add sidewalls to metal building, add two overhead doors, add four <br />painted pipe bollards, add electric power, add 4" fiberglass insulation <br />ADD $25,157.00 <br />Acceptable. <br />17. Maintenance Building <br />- Go to Ashford formula concrete hardener <br />ADD $3,784.00 <br />Acceptable <br />18. Maintenance Building and Vehicle Storage <br />- Delete galvanized snow bar <br />DEDUCT $23,236.00 <br />Owner's Call. <br />19. Go to 1000 gallon sand filter in lieu of 2000 gallon. <br />DEDUCT $2,800.00 <br />Acceptable. <br />20. OFFICE — delete two 5A aluminum glass openings and wooden doors in <br />0115 and 0116. Add metal studs and painted gypsum board. <br />DEDUCT $4,416.00 <br />Acceptable. <br />September 30, 2022 <br />5of5 <br />