My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-01-R
CITY-OF-BATESVILLE
>
City Clerk
>
Resolutions
>
2023
>
2023-12-01-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2024 4:56:13 PM
Creation date
12/13/2023 3:44:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Phased Construction Documents—February through December,2024 <br /> Phased Sub-Contractor Bidding—May 2024 through January 2025 <br /> .2 Construction commencement date: <br /> September 2024 <br /> .3 Substantial Completion date or dates: <br /> September 2026 <br /> .4 Other milestone dates: <br /> TBD <br /> §1.1.5 The Owner intends the following procurement and delivery method for the Project: <br /> (Paragraph Deleted) <br /> Construction Manager. Architect will provide assistance and recommendations to the Owner during the <br /> Construction Manager selection process. <br /> §1.1.6 The Owner's anticipated Sustainable Objective for the Project: <br /> (Paragraph Deleted) <br /> Not Applicable <br /> (Paragraph Deleted) <br /> §1.1.6.Not Applicable. <br /> §1.1.7 The Owner identifies the following representative in accordance with Section 5.3: <br /> (Paragraph Deleted) <br /> Jeff Owens <br /> 500 E.Main Street <br /> Batesville,Arkansas 72501 <br /> Email Address:'parksdirector@cityofbatesville.com <br /> §1.1.8 The persons or entities,in addition to the Owner's representative,who are required to review the Architect's <br /> submittals to the Owner are as follows: <br /> (List name,address, and other contact information) <br /> None <br /> §1.1.9 The Owner shall-retain the following consultants and contractors: <br /> (List name, legal status,address,and other contact information) <br /> f 1 Geotechnical Engineer(Architect will provide assistance and recommendations during the Owner's <br /> Selection Process.): <br /> To Be Determined <br /> Init. AIA Document B101—2017.Copyright©1974,1978,1987,1997,2007 and 2017.All rights reserved."The American Institute of Architects,""American Institute <br /> of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 3 <br /> 17:10:13 ET on 11/30/2023 under Order No.4104245152 which expires on 09/10/2024,is not for resale,is licensed for one-time use only,and may only be used <br /> / in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. <br /> User Notes: (3B9ADA2B) <br />
The URL can be used to link to this page
Your browser does not support the video tag.