My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-12-01-R
CITY-OF-BATESVILLE
>
City Clerk
>
Resolutions
>
2023
>
2023-12-01-R
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2024 4:56:13 PM
Creation date
12/13/2023 3:44:54 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TABLE OF ARTICLES <br /> 1 INITIAL INFORMATION <br /> 2 ARCHITECT'S RESPONSIBILITIES <br /> 3 SCOPE OF ARCHITECT'S BASIC SERVICES <br /> 4 SUPPLEMENTAL AND ADDITIONAL SERVICES <br /> 5 OWNER'S RESPONSIBILITIES <br /> 6 COST OF THE WORK <br /> 7 COPYRIGHT$AND LICENSES <br /> 8 CLAIMS AND DISPUTES <br /> 9 TERMINATION OR SUSPENSION <br /> 10 MISCELLANEOUS PROVISIONS <br /> 11 COMPENSATION <br /> 12 SPECIAL TERMS AND CONDITIONS <br /> 13 SCOPE OF THE AGREEMENT <br /> ARTICLE 1 INITIAL INFORMATION <br /> §1.1 This Agreement is based on the Initial Information set forth in this Section 1.1. <br /> (For each item in this section, insert the information or a statement such as "not applicable"or "unknown at time <br /> of execution.') <br /> §1.1.1 The Owner's program for the Project: <br /> '(Insert the Owner's program, identify-documentation that establishes the Owner's program, or state the manner in <br /> which the program will be developed.) <br /> To Be Determined <br /> §1.1.2 The Project's physical characteristics: <br /> (Identify or describe pertinent information about the Project's physical characteristics,such as size;location; <br /> dimensions,geotechnical reports;site boundaries;topographic surveys;traffic and utility studies;availability of <br /> public and private utilities and services;legal description of the site, etc) <br /> To Be Determined <br /> §1.1.3 The Owner's budget for the Cost of the Work,as defined in Section 6.1: <br /> (Provide total and, if known,a line item breakdown.) <br /> To Be Determined <br /> §1.1.4 The Owner's anticipated design and construction milestone dates: <br /> .1 Design phase milestone dates,if any: <br /> Init. AIA Document B101—2017.Copyright @ 1974,1978,1987,1997,2007 and 2017.All rights reserved."The American Institute of Architects,""American Institute <br /> of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 2 <br /> 17:10:13 ET on 11/30/2023 under Order No.4104245152 which expires on 09/10/2024,is not for resale,is licensed for one-time use only,and may only be used <br /> / in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. <br /> User Notes: (3B9ADA2B) <br />
The URL can be used to link to this page
Your browser does not support the video tag.