My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2024-02-13-AGENDA
CITY-OF-BATESVILLE
>
Web Folders
>
Agendas
>
City Council Agendas
>
2024
>
2024-02-13-AGENDA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2024 4:44:16 PM
Creation date
2/12/2024 4:43:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
but not limited to asphalt or concrete, the city may charge an additional $25.00 per foot of crossing <br />or boring. However, in the event a third party must be contracted to complete the road crossing or <br />boring, the fee shall be equal to the City's charges accrued for services under the contract. Road <br />bores for meters over 1" shall be charged at the cost of materials, parts, labor. and equipment usage. <br />Section 6. Road Crossing or Boring Fee -Sewer <br />Roads bores for sewer connections shall be the responsibility of the customer or contractor. <br />Batesville Water Utilities shall be contacted prior to construction to verify compliance with city's <br />standards and to allow time to schedule a representative to inspect the road bore. <br />Section 7. Inspection Fees <br />The fee for inspections, both water and sewer, conducted inside the Batesville City limits <br />shall be $35.00 per trip. If an inspection is required after normal work hours, the charge shall be <br />$70.00. For each hour in excess of two (2) hours, the charge shall be $35.00 per hour. <br />The fee for inspections, both water and sewer, conducted outside the Batesville City limits <br />shall be $45.00 per trip. If an inspection is required after normal work hours, the charge shall be <br />$90.00. For each hour in excess of two (2) hours, the charge shall be $45.00 per hour. <br />If more than one inspection is performed on the same property for the same customer during <br />the same trip in the normal allotted time, the charge shall be for one trip. Inspections may include <br />the water service line, the sewer service line (sanitary sewer) and new construction rough -in, top - <br />out and final inspection. <br />Section 8. Water Billing, Non -Payment Fees, Disconnect Fees, and Reconnect Penalty Fees <br />Water bills will be sent out on the last working day of each month and shall be payable on or <br />before the 20th day of the following month. Non-payment, disconnect and reconnect penalties and <br />charges shall be on a per trip or per request basis as follows: <br />Description Amount Explanation <br />
The URL can be used to link to this page
Your browser does not support the video tag.