My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-09-07
CITY-OF-BATESVILLE
>
City Clerk
>
Minutes
>
2010
>
2010-09-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2016 3:07:06 PM
Creation date
6/2/2016 3:07:04 PM
Metadata
Fields
Template:
City Clerk
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
B) ENGINEER'S REPORT <br /> City Engineer Damon Johnson addressed the council with his engineer's report. Mr. <br /> Johnson said the tunnel project was preceding about 5 to 6 feet per day and lacks about <br /> 150 for completion. The smoke testing is continuing and he is hopeful that it will be <br /> completed in three more days. Mr. Johnson told the council that the department heads <br /> met with Miller-Newell engineering firm to talk about what site plans for a new shop for <br /> all the city departments. Mr. Johnson told the council that the Levee recertification <br /> was on track and awaiting a request for some additional items. <br /> C) REVIEW AUGUST 2010 FINANCIALS <br /> The council was given a copy of the August 2010 financials for review. <br /> D) CONSIDER AN ORDINANCE TO AMEND THE ANIMAL CONTROL ORDINANCE <br /> Mayor Elumbaugh told the council that the animal control ordinance amendments <br /> were not ready and it would be moved to the September 21, 2010 meeting. <br /> MAYOR COMMENTS <br /> Mayor Elumbaugh reminded the council of an upcoming budget meeting at the <br /> Municipal League on September 15, 2010. The Mayor informed the council that the heat and <br /> air unit at the municipal building was in need of a new dryer. This dryer would remove the <br /> moisture out of the airlines that go to all the thermostats. The quote from carrier was $3690. <br /> Mr. Jonathan Abbott told the council that this was something that should be done so the <br /> thermostats would not have to be replaced at a later date. Councilmember Bryant made a <br /> motion to proceed with the work and Councilmember Krug seconded. All were in favor. <br /> Mayor Elumbaugh Informed the council of the upcoming Sara Low 5K run on September 11, <br />
The URL can be used to link to this page
Your browser does not support the video tag.